We just finished a server migration for our server. Actually, it is a hardware migration with new powerful server.
From
Win 2000 Adv Server + SQL 2000 to Win 2003 Ent + SQL 2000
After that, we found the script though linked server to another instance is much slower than before. The linked server setup is the same us before. Can anyone have idea on this