Hello,
I have currently setup logshipping in our staging. And now I am planning to move the database data and log files on the primary server to a different drive. To perform this activity I plan on detaching the databases, move them to the new drives and then attach them. I do not want to failover to the secondary in this scenario as I am doing this maintenance during a downtime. In this scenario how would I stop and resume the log shipping?
Thanks,